Renovation budget calculator to plan the total and what to save each month
Write down what the renovation will cost in four lists: works, materials, furniture and appliances, and everything else. Add a reserve for what nobody foresaw, and the renovation budget calculator shows the total. If the start is some months away, it also shows how much to put aside each month. There are no prices per square metre here on purpose: they differ too much between countries and cities, so the numbers come from your own quotes.
Example: all costs $12,000, a reserve of 15 percent, 12 months before the start. Enter your own numbers.
This is an estimate, not financial advice: it adds up your own numbers, and the real cost comes from quotes and can differ from the plan.
How the renovation budget calculator counts
There are four steps, and each can be done on paper. First, the four lists are added up: works, materials, furniture and appliances, and other. Second, the reserve is that sum times the percent you choose, rounded up to a whole unit. Third, the total is the sum plus the reserve. Fourth, if you give the months before the start, a month to save is the total divided by the months, also rounded up. Rounding up means the plan is never a little short. Cents in the costs are left out.
Take works 6,000, materials 4,000, furniture and appliances 2,000, other 0, a reserve of 15 percent and 12 months. The sum is 12,000, the reserve is 1,800, and the total is 13,800. Divided by 12 months that is 1,150 a month. With an uneven sum, say works 4,500, materials 3,200, furniture 1,800 and other 490, the sum is 9,990. Fifteen percent of it is 1,498.5, which rounds up to 1,499, so the total is 11,489. Over 10 months that is 1,148.9, shown as 1,149 a month. The calculator shows an error and no result if a cost is not a sum, all four are 0, the reserve is not from 0 to 50 percent, or the months are not a whole number from 1 to 120. The months field can stay empty.
What goes into each list of a renovation budget
A list is only useful when nothing falls between the lists. One simple way to split the costs is below, and you can move items around as long as each one is counted once.
- Works: the crew or the masters, demolition, electrics, plumbing, finishing, and the removal of waste.
- Materials: floor, tiles, paint, wallpaper, plaster, pipes, cable, switches and the delivery of all this.
- Furniture and appliances: kitchen, wardrobes, a sofa, a fridge, a washing machine, lamps and curtains.
- Other: design, permits, a rented flat while the work goes on, cleaning after the crew, small things you will buy on the way.
If the crew buys materials for you, count them once, in works or in materials, not in both. Tell the calculator the plain sums from the quotes, and leave out what you already have.
Try Luzik to keep your daily money in order while you save for the work
Why the numbers come from quotes and not from a price per metre
A price per square metre sounds handy, but it hides the things that change the cost most: the state of the walls, the pipes, the quality you choose and the city you live in. Any single figure would be wrong for many readers, so this page has none. Ask two or three contractors for a written quote with the same list of works, and compare them line by line. A quote that is much lower than the others often leaves something out, so ask what is not included.
Put the middle quote into the works list. For materials, ask the contractor for a list and check a few prices in shops yourself. For furniture and appliances, go through what you want to buy and write the price you would really pay.
A reserve for surprises in a renovation
Walls hide things. Behind a tile there can be old pipes, a floor can need levelling, and a plan that looked complete grows by a few extra lines. The reserve is the money for this. The calculator starts with 15 percent only as an example. How much to keep is your choice and depends on how old the home is and how much you are changing: a fresh coat of paint needs less than an apartment stripped to the concrete, and you can ask your contractors what they would set aside. Some people set the reserve at 0 and keep their own cushion elsewhere, and that works too.
It helps to decide before the work starts what the reserve is for, so that it does not slowly turn into a nicer tap. If the reserve is left at the end, it is yours.
Paying in stages and saving month by month
Renovation rarely costs money all at once. Many contractors ask for an advance, then payments after each stage, and the last one when the work is accepted. Paying in stages also gives you a way to check the work before you pay for it. Agree on the stages and the sums in writing before you start.
If you have months before the start, the monthly line shows how much to put aside. For a goal and a date you can also use the savings goal calculator. In Luzik, the daily limit and its recalculation are free forever. When you spend a little less than your limit, the Save up mode moves the difference to the piggy bank. A big payment counts Across all days by default, How to count in the budget settings can make it From the piggy bank, and Don’t count keeps one entry out of the limit. More about this is in big purchases in Luzik. This text is general information, not personal advice.
Questions
How do I calculate a renovation budget?
List every cost in four groups: works, materials, furniture and appliances, and other. Add them up, then add a reserve for surprises as a percent of the sum. The result is the total. Use real quotes for the numbers, not a price per metre.
How much reserve should a renovation have?
It is your choice, and it depends on how old the home is and how much you change. The calculator starts with 15 percent as an example and accepts 0 to 50. Ask your contractors how much they would keep for unplanned work.
Why is there no price per square metre?
Prices differ a lot between countries, cities and the work itself, and we cannot source a fair figure for every reader. Written quotes from two or three contractors tell you more.
Is the monthly sum rounded up or down?
Up, to a whole unit, so that the months never add up to less than the total. For a total of 11,489 and 10 months it shows 1,149 a month.
Should I count furniture in the renovation budget?
Yes, if you buy it because of the renovation. Keep it in its own list, so you can see the cost of the work apart from the cost of the new things.